Malampaya Drilling Campaign


Scope of Work:

BGS Team provided project management, drilling engineering and mooring design services

General Points On Drilling Campaign

Planning/Design Stage

  • Carry out final reservoir modeling to finalize well locations and trajectories
  • Reservoir modeling to indicate optimum length of horizontal, producing section
  • Reconfirm pressure profiles to optimize casing program

Drilling Stage

  • Manage sufficient anchor handling/tow vessels on hand at all time to allow for rig move if required for metocean conditions
  • Wells drilled with synthetic based mud  for superior characteristics
  • Black Gold experienced rig foremen onboard rig at all times