Oyong Project

 

Scope of Work:

BGS Team managed the Wellhead Structure Fabrication Services  and installation works.


Oil from the Oyong field is produced using an offshore wellhead platform. The Ocean Sovereign jack-up drilling rig was used to install the platform. The triangular wellhead platform consists of a tall template structure, a stacked template structure, a conductor pile and a wellhead deck.